Why is the link-up failure observed for the F-tile Dynamic Reconfiguration Suite IP with Auto-Negotiation and Link Training (AN/LT) enabled designs when trying to skip Link Training (LT)? - Why is the link-up failure observed for the F-tile Dynamic Reconfiguration Suite IP with Auto-Negotiation and Link Training (AN/LT) enabled designs when trying to skip Link Training (LT)? Description Due to a problem in the Quartus® Prime Pro Edition software version 24.3.1, you may see the link-up failure for the F-tile Dynamic Reconfiguration Suite IP with Auto-Negotiation and Link Training (AN/LT) enabled designs when trying to skip Link Training (LT). Resolution Currently, there is no workaround for this problem. The ideal user flow is as follows: AN --> AN done --> perform DR --> DR done --> start LT --> LT done --> data mode+send traffic This problem is scheduled to be fixed in a future version of the Quartus® Prime Pro Edition software. Custom Fields values: ['novalue'] Errata 14024310520 False ['F-Tile Auto-Negotiation and Link Training for Ethernet IP'] ['FPGA Dev Tools Quartus® Prime Software Pro'] novalue 24.3.1 ['Agilex™ 7 FPGAs and SoCs'] ['novalue'] ['novalue'] ['novalue'] - 2025-04-23

external_document