4.4. Design Walkthrough - Setting up and running the HDCP over DisplayPort design example consists of five stages. - 2025-12-16

F-Tile DisplayPort IP Design Example User Guide

Version
25.3
Setting up and running the HDCP over DisplayPort design example consists of five stages.
  1. Set up the hardware.
  2. Generate the design.
  3. Edit the HDCP key memory files to include your HDCP production keys.
    1. Store plain HDCP production keys in the FPGA (Support HDCP Key Management = 0)
    2. Store encrypted HDCP production keys in the external flash memory or EEPROM (Support HDCP Key Management = 1)
  4. Compile the design.
  5. View the results.