3.4.3. Partial Reconfiguration External Controller IP Timing Specifications - 2026-02-19

Quartus Prime Pro Edition User Guide Partial Reconfiguration

Version
25.1

Timing Specifications: Partial Reconfiguration External Controller IP illustrates a successful PR operation with the Partial Reconfiguration External Controller IP. The PR operation initiates upon assertion of the pr_request signal. The avst_ready output signal indicates whether the SDM is ready to accept data from an external host.

Figure 67. Timing Specifications: Partial Reconfiguration External Controller IP