You can determine which fixed assignments
to load from the project settings .qsf, and optionally
load the latest placement from Logic Generation. The enabled assignments become the starting
point for the tile plan.
Follow these steps to update the plan with existing
assignments:
-
On the Flow control, click
View Assignments.
-
On the Assignments tab, select
the assignment types to load for the current planning session, as Assignments Tab Controls
describes.
-
On the Assignments tab, enable
or disable assignments to resolve any conflicts or experiment with alternative placements.
Filter the list of assignments by assignment name or status.
Figure 40. Enable or Disable Existing Assignments for Current Planning
Session
-
When assignment selections are complete, or if you have no existing
assignments, click Update Plan on the Flow control to apply the enabled project assignments to
your current tile interface plan.
-
Place IP components and building blocks on the Plan tab, as
Step 4: Create a Tile Plan
describes.