Interface Planner requires at
least a partially complete, synthesized
Quartus® Prime project
as input. You can also use Interface Planner to adjust
placement for a fully complete design project.
Follow these steps to setup the project and run
synthesis:
-
Complete at least the following steps for your design:
- Fully define known device periphery interfaces.
- Instantiate all known interface IP cores.
- Declare all general purpose I/Os.
- Define the I/O standard, voltage, drive strength, and slew rate for
all general purpose I/Os.
- Define the core clocking (optional, but recommended).
- Connect all interfaces of the periphery IP to virtual pins or test
logic. This technique creates loop backs on any interfaces in the shell design,
helping to ensure that periphery interfaces persist after synthesis optimization.
-
To synthesize the design, click . You must run at least Analysis & Synthesis before running Interface Planner.